A restroom plan that works as hard as your crew.

Plan for the busiest shift, the whole rental period and the service truck that needs to get back in. A low unit count is only useful if the facilities stay sanitary and accessible to workers.

Portable restrooms positioned beside an active construction site
General planning imagery. Not a Stillwell project or supplier inventory. Photo credits

Start with peak crew, then discuss servicing.

Give suppliers the highest number of workers on any shift, the shift length, expected project duration and any existing usable toilets. Ask how cleaning frequency changes the number of units they recommend.

Our planner uses one unit per 10 workers with weekly service as an operational starting point. OSHA’s 2006 interpretation discusses 10 users with weekly service and 20 with twice-weekly service as examples of keeping facilities sanitary. Actual conditions still matter.

Separate federal minimums from a workable plan.

Federal OSHA construction standard 1926.51 includes a fixture-count table, with one facility for 20 or fewer employees, then combinations of toilet seats and urinals at higher staffing levels. Do not treat a single “one per 20” shortcut as the full rule.

OSHA says an unsanitary toilet does not count as a provided facility. State-plan requirements, local codes, exposure-related washing duties and access conditions may change the plan. Consult the standard and your responsible safety professional for the site.

Put the service route on the site drawing.

  • Show the entrance, gate hours and a level placement area.
  • Check the supplier’s truck access, hose reach and relocation rules.
  • Keep equipment outside vehicle swing paths and away from stored material.
  • Confirm restocking, waste removal and who handles an extra service visit.
  • Discuss genuine handwashing with water, soap, towels and contained wastewater.

Ask for a complete recurring quote.

Have the written quote identify the rental period, included visits, delivery, collection, extensions, damage terms and relocation charges. Confirm how to report a missed service or a sudden increase in crew.

Primary references

Checked November 6, 2026. Confirm current requirements with the responsible authority.

YOUR NEXT STEP

Get your rental
off to a good start.

Keep your dates, headcount and setup in one place. Share the same checklist with every supplier you contact.

Create your rental plan →Your plan. Your suppliers. Your call.